Before You Pay the Deposit

A practical checklist for your first order from a new supplier. What to agree in writing, what to photograph, and the three points where a good product quietly turns into a bad shipment.

Download the checklist (PDF)

Most of the expensive mistakes on a first order are not manufacturing defects. They are agreements that were never written down. The factory builds exactly what was specified, and the damage happens in what was not.

This checklist is the one we work through with brands before a deposit goes out. It is free, it needs no login, and it is designed to be printed and marked up. If you only do one thing on it, start with the first section — the parts that must be in writing before you transfer money.

What has to be in writing

Product identity and materials

"as discussed" is not a specification. A material grade is a number, not a word.

Acceptance criteria — what "good" means, before you argue about it

If the definition of a defect is written after the goods exist, the discussion becomes an opinion.

Packaging, labelling and carton data

A perfect product in the wrong bag is still a problem at the warehouse.

Compliance and documents

Certificates are cheap before production and expensive after it.

Time, money and change control

The two clauses that most often save a first order are "when" and "no verbal changes".

The evidence file

Keep these in one folder. If a dispute ever happens, this folder is the difference between a claim and a complaint.

Where a first order actually goes wrong

Checkpoint 1 — First article (before the run)

When: after the line has produced the first pieces, before mass production.

Why here: you are still changing a mould, a print file or a spec sheet. This is the cheapest place to be wrong.

Checkpoint 2 — During production

When: once a meaningful share of the order is finished and packed (commonly after roughly 20–30%).

Why here: there is still time to fix tooling, re-cut fabric or reprint packaging — and still time to move the ship date.

Checkpoint 3 — Pre-shipment (before the balance)

When: when 100% of the order is finished and packed, before the balance payment and before loading.

Why here: the only decision left is ship, hold or negotiate — which is exactly why the report matters.

Found at What you can still change What it usually costs you
First article mould, print file, spec, supplier A conversation and a few days
During production tooling, materials, packing, ship date Rework on part of the run
Pre-shipment ship, hold, or negotiate a discount Rework or a discount on the whole run
After it lands nothing at the factory level Freight back, storage, returns, a launch date

The 10-minute check

Answer these before the deposit leaves your account. If you cannot answer three or more, the order is not ready.

  1. Can I name the colour reference number, or is it a word?
  2. Does every dimension that matters have a tolerance written next to it?
  3. Is there a signed golden sample, and do I hold one?
  4. Have I agreed what counts as critical / major / minor?
  5. Is the balance tied to a passed check rather than a date?
  6. Do I know exactly what the packaging looks like, on paper, approved?
  7. Do I know which certificates this product needs in my market, and who is paying?
  8. Is there a written rule that no material or sub-supplier changes without my approval?
  9. Do I know the ETD, and does it survive the holiday window?
  10. Do I know what happens, in writing, if the goods fail?

Five ways a good product turns into a bad shipment

  1. "Off-white." The sample was off-white, the bulk was yellow. The factory made what was written — a word. Nobody had given a number.
  2. The barcode on the fold. The product passed every check. The barcode printed across the seam of the box, scanned badly, and the shipment stalled at the warehouse.
  3. The carton nobody weighed. Beautiful product, 28 kg per box. The marketplace rejected the delivery before anyone opened it.
  4. "We changed the material, it's better now." Said verbally, two weeks before shipping. It was cheaper, and it was not what was approved.
  5. The balance paid on a date. The money went out on the 15th because the 15th was in the contract. The inspection would have been on the 18th.

What this checklist cannot do

An inspection, and a checklist, tell you what the goods are like on the day someone looks at them. They do not promise the factory will still be there in six months. They do not promise the product will sell. They do not replace your own judgement about whether a supplier is trustworthy.

What they do is move the conversation from opinion to evidence, which is usually the difference between a discount and a total loss. If a supplier tells you none of this is necessary, that is information too.